Technical Information
| Properties |
Text Method |
Result |
| Solid Content |
TGA/DTA Analyser |
(69%) |
| Polymer Content |
TGA/DTA Analyser |
(35 %) |
| Hardness (Shore A) |
ASTM D 2240 : 2002 |
(80 Shore A) |
| Tensile Strength |
ASTM D 412 : 2002 |
2.6 N/mm2 |
| Elongation at Break |
ASTM D 412 : 2002 |
100 % |
UV Resistant - Accelerated
Weathering (2000 hours) |
ASTM G 154 : 2000 |
Excellent : No thermal degradation,
Weathering (2000 hours) cracking, chalking and discolouration |
| Adhesion Strength |
ASTM D 4541 : 2002 |
0.9 N/mm2 |
| Water Vapour Transmission |
ASTM E 96 : 2000 |
19 g/m2 /day |
| Algae & Fungus Resistant |
SS 345 : 1998 |
No algae & fungus Growth |
| Crack Bridging |
ASTM C 836 : 1995(Adopted) |
a) No cracks up to 2 mm width
b) No cracks up to 1 mm (10 cycles) |
Area Of Application:
- All new RCC flat and sloping roofs.
- Existing cementitious waterproofing treatments like brick-bat-coba, concrete screeds, acrylic coatings, etc.
Method of Application
Surface Preparation
- Prepare the surface thoroughly by cleaning, washing and removing dust, dirt, oil, grease and loose particles.
- Ensure that the roof slope is a minimum of 1 in 100.
- In existing old terraces such as brick-bat-coba or screeds, the substrate must be checked for its soundness.
Damaged or hollow portions, sharp edges etc. must be cut and repaired with a polymer-modified screed. Surface
cracks must be filled with Crack-X Powder or, polymer-modified mortar in case of wider cracks.
- Bitumen based waterproofing treatments must be completely removed by mechanical scarification or by any
other effective mechanical means.
Application Procedure
- Apply one coat of Dr. FIXIT PRIMESEAL (diluted with water in the ratio 2:1) at the rate of 12-15 sqm per litre. Allow
it to dry for 2-3 hours
- Apply the first coat of DR. FIXIT NEWCOAT at the rate of 2 sq.m. per litre and allow it to dry before taking up the
second and third coats, the rate of application being the same.
- The sequence of colours viz. pink, green and grey can be decided depending on the desired top coat colour.
- In case only two colours are being used, ensure that the colour of the first and the third coat are the same. This
would ensure correct consumption of material that will deliver a total DFT of 1 mm.
- Drying time between coats will be 6 - 8 hours
- Ensure that the primer and the 3 coats of DR. FIXIT NEWCOAT totally achieve a minimum thickness of 1 mm
DFT
- Allow the system to air cure for 7 days.
|
|
|
Cementitious Substrate |
Application of Dr. Fixit Primeseal |
|
| |
|
|
|
|
|
Application of 1st coat of Dr. FixitNewcoat |
Roller Application of Dr. Fixit Newcoat |
Application of 2nd coat of Dr. Fixit Newcoat |
| |
|
|
|
|
|
Application of 3rd of Dr. Fixit Newcoat |
|
|
| |
|
|
Precautions & Limitations
- All corners, gaps, joints, protrusions & outlets shall be coated with two extra coats.
- Do not apply during rains; substrate MUST be in SSD condition for application of primer.
- For extreme temperatures, consult DR. FIXIT Team
- The product is designed only for foot traffic, and not vehicular or movement of machinery or equipment.
|